Construction

Pre-construction Design Review
The pre-construction design review is an essential phase where the project's designs and plans are thoroughly evaluated before construction begins. This process involves reviewing all design documents, including architectural, structural, mechanical, and electrical drawings. The goal is to ensure the designs meet all relevant codes and standards, identify any potential issues or conflicts, and optimize the construction process. It is also an opportunity to assess the project's feasibility, cost, and scheduling, ensuring that all stakeholders align with the proposed designs. The outcome of this phase is typically a finalized design package that serves as the foundation for the construction process.
Construction and Assembly Progress Review
The construction and assembly progress review involves regularly scheduled meetings and assessments throughout the construction phase to monitor the project's advancement. These reviews ensure that work is proceeding according to the approved schedule and budget. Key elements such as the completion of specific milestones, quality of workmanship, safety performance, and adherence to design specifications are evaluated. This process also provides an opportunity to identify and address any delays, resource shortages, or quality issues promptly, ensuring that the project stays on track and any necessary adjustments are made in a timely manner.
Material and Quality Inspection
Material and quality inspection is a critical aspect of construction to ensure that all materials used meet the specified standards and project requirements. This involves inspecting and testing materials for compliance with regulations, durability, and suitability for the intended application. Inspections are typically carried out both at the point of delivery and during installation. Proper documentation of these inspections ensures that any non-compliant materials are identified and replaced, preventing potential issues during construction or post-construction. Additionally, quality assurance processes are implemented throughout the construction to maintain a high standard of workmanship.
Factory Acceptance Test (FAT)
The Factory Acceptance Test (FAT) is a process conducted prior to the delivery of equipment or systems to the construction site. It involves testing and verifying that all components, systems, and machinery function according to design specifications and project requirements while still at the manufacturing facility. FATs are particularly crucial for complex equipment, ensuring that they meet all operational, safety, and performance standards before being shipped. These tests provide confidence that the equipment will function correctly once installed, reducing the risk of failures or delays during the construction phase.
Delivery, Offloading & Storage Plan
The delivery, offloading, and storage plan is designed to ensure the smooth arrival, handling, and storage of materials and equipment at the construction site. This plan outlines the logistics of transporting items, including the necessary scheduling, route planning, and coordination with suppliers. It also specifies procedures for unloading materials safely and efficiently, minimizing the risk of damage during handling. Storage plans are equally crucial, detailing the safe and secure storage of materials to prevent deterioration, theft, or loss. A well-developed plan ensures that the site is ready to receive materials on time, allowing the construction process to proceed without delays.
CDM: Pre-construction Plan (PCP)
The Pre-construction Plan (PCP) under the Construction (Design and Management) Regulations (CDM) outlines the health and safety procedures and requirements that must be followed before construction work begins. It includes identifying potential hazards, assessing risks, and establishing mitigation strategies for the project. The PCP also includes the appointment of key personnel, such as the principal contractor and designers, and outlines their responsibilities in maintaining safety throughout the construction process. This plan helps to create a safe working environment by ensuring that risks are managed proactively before construction starts.
CDM: Construction Phase Plan (CPP)
The Construction Phase Plan (CPP) is developed once the construction phase of the project begins and builds upon the foundation established by the PCP. It provides a detailed framework for managing health and safety risks during the construction process. This plan includes specific safety measures, risk assessments, site rules, and emergency procedures to safeguard workers and contractors on the site. The CPP is regularly reviewed and updated to reflect any changes or unforeseen circumstances that may arise during construction. It is a legally required document under the CDM regulations to ensure a comprehensive approach to health and safety throughout the entire construction phase.